building surveys
SERVICE DESCRIPTION |
REPORT DESCRIPTION |
PRICE |
|||||||||||
Service Type |
Examination Documentation available Visual examination of building |
Visual structural examination incl. external grounds and retaining structures |
Visual examination of general services (Elec, Plumb, Drains ..) |
Approximate costing of works to be done. |
Full testing of electrical and mechanical installations A/C heating by independent qualified service engineer |
Building defects Comments |
Full report with illustrations |
Full Report with illustrations including recommended solutions |
Full Report with illustrations including recommended solutions and costings |
Full Report with illustrations including recommended solutions and costings. Full Electrical report included |
Please contact us for price |
||
Service 1 |
Yes |
No |
No |
No |
No |
Yes |
No |
No |
No |
No |
|||
Service 2 |
Yes |
Yes |
No |
No |
No |
Yes |
Yes |
No |
No |
No |
|||
Service 3 |
Yes |
Yes |
Yes |
No |
No |
Yes |
Yes |
Yes |
No |
No |
|||
Service 4 |
Yes |
Yes |
Yes |
Yes |
No |
Yes |
Yes |
Yes |
Yes |
No |
|||
Service 5 |
Yes |
Yes |
Yes |
Yes |
Yes |
Yes |
Yes |
Yes |
Yes |
Yes |
|||
diagnosis
Principle of diagnosis by victor management
Step 1 – Information Gathering
- Collection of background information:
• About the site, geology, drainage, trees, former uses;
• About the present and former uses of the building and the intensity of use;
• About the locality, neighbouring uses, climate and microclimate, pollution sources.
Gathering of information from:
• Owners, users, neighbours, local authority;
• Records, photographs, maps, newspapers and local reference library.
Step 2 - Site Investigation
- • Inspect defect and surrounding construction;
• Open up structure where necessary;
• Take measurements (tell-tales, relative humidity, levels, etc);
• Carry out in-situ testing (load testing, moisture content, presence of salts, etc);
• Carry out laboratory tests.
Step 3 – Diagnosis and Evaluation of Collected Data
- The investigator needs:
• To adopt a logical and methodical approach;
• To employ clear analytical methods;
• Use a comprehensive knowledge of building construction (new and obsolete).